Electro-technology company operating throughout Australia to deliver installation, maintenance and manufacturing services from inception to replacement.
Nilsen provides electrical engineering and contracting to the resources sector and is continuously engaged in a large diversity of projects including:
The scope of projects is broad covering high voltage, medium and low voltage reticulation, motor control centres, automation, auxiliary generation plant, data and security networks.
The Sino Iron project is a large-scale magnetite iron ore processing facility located at Cape Preston, Western Australia (about 100km from Karratha). The project has access to 2 billion tons of iron ore with rights to an additional 4 billion tonnes, making it one of the largest mine sites in the world when it comes into operation, with annual production capacity of 2.76 million tons of concentrate and/or pellet.
The overall project is composed of three functional areas: mining area, crushing and concentration area, and Cape area.
NRPL’s contract started with the E&I installation and commissioning assistance work from the Crusher to the stockpile in the Concentrator Area. In Feb 2012, NRPL was further awarded the E&I installation and pre-commissioning package for the Tailings Dam with an estimated duration to March of 2013. However, given the open-ended nature of the contract, the project works are expected to be extended over time.