Perth Airport T1 HV Install

Client: Perth Airport
March 10, 2016

Perth Airport T1 HV Install

Client: Perth Airport
March 10, 2016
Perth International Terminal (T1) at Perth Airport is located on the eastern side of the main runway, and is open 24 hours a day, seven days a week.

Nilsen were engaged for the replacement of the High Voltage Ring Main Unit, design of the new remote operation control system and implement it into the existing SCADA system.

Nilsen utilised a team of 6 highly specialised staff to perform the HV equipment upgrade which was conducted airside with minimum number of controlled shutdowns to electrical services and no interruption to flights and services.

Complex planning and complete re-designing of the existing configuration was required by Nilsen to ensure the smooth interaction between old and new HV equipment and ensure no interruption to the operation of the airport.

Nilsen successfully completed the works over a 2 month period (August – September 2015) on time and in budget.

Download the factsheet here

Explore more case studies

Visy Glass Project Apollo (Yatala)

Visy Glass Project Apollo (Yatala)

The Visy Glass Recycling and Manufacturing Facility at Stapylton, Queensland, is a major industrial development combining a glass recycling cullet plant, container glass manufacturing facility, and finished goods warehouse on a greenfield and brownfield site. The...

read more

Get in touch

We’re here to deliver electrical technology solutions.

From large-scale infrastructure to tailored electrical solutions, reach out to our team today to find out how we can support your project.