The development of RubberGem’s new facility at 6 Lodge Drive, East Rockingham required the delivery of a complete HV electrical distribution network to provide the permanent electrical infrastructure required for the new building and its industrial operations.

Nilsen was engaged to deliver the site’s HV installation, providing an integrated solution extending from the Western Power intake through to the private HV distribution network and three transformer substations. The project incorporated civil works, HV switchgear, transformers, HV cabling, cable terminations, earthing systems and comprehensive testing and commissioning.

A key component of the project was the construction of a new HV compound to Western Power requirements at the site entrance. Nilsen’s works included ground preparation, construction of the compound infrastructure, conduits, earthing, cranage and installation of the client’s outdoor Ring Main Unit. The incoming HV cabling to the compound was provided by Western Power, with Nilsen completing the associated HV cable terminations and integration into the site’s private network.

From the incoming supply, Nilsen installed the private HV reticulation required to distribute power throughout the new development. Specialist cable pulling equipment was utilised to install the HV cabling between the intake and transformer substations, followed by specialist HV terminations, equipment connections and earthing works.

 

The completed network incorporated three transformer substations.

Substation 1 was equipped with a 1.5 MVA transformer, Substation 2 with a 2 MVA transformer, and Substation 3 with a 2.5 MVA transformer, providing a combined installed transformation capacity of 6 MVA. Nilsen completed the associated civil preparation, conduits, HV cabling, terminations, earthing, specialised cable pulling, cranage and equipment installation required across the three substations.

The HV network incorporated 22 kV Schneider RM6 switchgear, providing the switching and protection required for the site distribution system. The main RMU incorporated dedicated circuits for the customer main supply, Transformer 1.1, the connection to the downstream RMU and a spare circuit, providing flexibility within the completed network.

Nilsen’s involvement extended beyond installation into a comprehensive testing and commissioning program covering the RMUs, transformers, HV cables, earthing systems and arc flash protection. Site acceptance testing included switchgear inspection, insulation resistance and HiPot testing, busbar continuity testing and protection relay secondary injection testing.

Protection testing was undertaken on the Schneider VIP protection system to verify overcurrent and earth fault protection performance and confirm correct operation of the associated circuit breakers. Testing confirmed satisfactory trip times and correct protection functionality prior to energisation.

The earthing system was also subject to specialist FOP and Step, Touch and Transfer testing. Testing was undertaken against the requirements of the project’s HV submission and AS/NZS 2067, verifying the performance of the installed earthing system and confirming compliant step and touch potential results.

 

The project required close coordination between Nilsen, Western Power, the client and the wider construction team to manage the interfaces between the utility supply, private HV network and new facility.

Equipment installation, cable works and commissioning activities were sequenced to support the development program and the transition to permanent power.

Quality and safety were maintained throughout the project through controlled HV installation practices, detailed inspection and testing procedures and comprehensive commissioning documentation. The commissioning process provided a complete technical record of the installed assets and verified the integrity and operational performance of the HV system prior to handover.

The completed project provided RubberGem with a new 22 kV distribution network and 6 MVA of installed transformer capacity, extending from the Western Power intake through to three dedicated substations servicing the facility.

The project demonstrates Nilsen’s capability to deliver complete utility to facility HV infrastructure for major industrial developments, combining Western Power interface works, HV switchgear, transformers, private HV reticulation, civil and earthing works, specialist cable installation and comprehensive in house testing and commissioning.

Download the factsheet here

Explore more case studies

Kwinana Primary Data Centre

Kwinana Primary Data Centre

The Kwinana Primary Data Centre project saw Nilsen (WA) Pty Ltd deliver the electrical and communications infrastructure for Synergy at the Kwinana Power Station site in Naval Base, WA. The new facility was set up to monitor and control operations across four major...

read more
Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital is a major tertiary hospital within Western Australia’s public health system, operating continuously and relying on highly resilient electrical infrastructure to support critical clinical and operational services. The Stage 1 High Voltage Upgrade...

read more
Beverley Plant Switchroom Expansion Project

Beverley Plant Switchroom Expansion Project

To support current and future mine expansion at Heathgate Resources’ Beverley Plant, Nilsen was engaged to design, construct, and deliver a new plant switchroom. The constrained, land-locked nature of the site required the switchroom to be installed in a suspended...

read more