Star Gold Coast Infrastructure Upgrade and Scope Gap Projects

Client: Probuild Construction
April 5, 2018

Star Gold Coast Infrastructure Upgrade and Scope Gap Projects

Client: Probuild Construction
April 5, 2018
Nilsen were awarded the Electrical Contract for the Star Gold Coast Casino & Hotel Infrastructure Upgrade project in late 2015, which primarily focused on construction of a new electrical central energy plant.

The project required a high level of coordination and careful planning to ensure minimal disruption and the best possible long term outcome for the principal, Star Entertainment Group. Nilsen were also awarded the Scope Gap Package to the project, which included design and verification, various HV works, supply and installation of 2 x Generators and 1 x Uninterruptable Power System (UPS), Communications, commissioning and HV auditing.

Nilsen’s scope of work on the Star Infrastructure and Scope Gap projects included the following technical disciplines:

  • Temporary Electrical Services
  • Supply and installation of 3 x High Voltage MSB and 13 x Low Voltage MSB
  • Installation of 5 x additional Transformers including High Voltage cabling connection
  • New Diesel Fuel system installation and associated works
  • Installation of new Energex metering substation
  • Installation of new primary Data Centre and associated backbone fibre and copper cabling

 

 

Being an operational business open 24/7, this project had a high degree of difficulty, particularly with regards to staging and cutovers. Nilsen worked closely with Star Group over the course of two months to accurately plan the staging of the 4 x High Voltage and 11 x Low Voltage cut overs. Nilsen also forged a strong relationship with the client by instigating design changes for cost givebacks. Due to the confidence felt by the client of Nilsen’s understanding of their business, Nilsen were subsequently awarded additional large packages, including the supply and installation of additional transformers, switchboards and generator systems. This was also the largest amount of mineral insulated metal sheathed (MIMS) “Pyro” cable Nilsen has installed in Queensland, totalling 13.6km, and subsequently the project team learnt new skills from experienced mentors. Not only was the project was completed on time, but both the project safety results and quality of workmanship was of a very high standard across Nilsen’s entire scope.

Notably, the project was also awarded the 2018 National Electrical and Communication Association (NECA) Queensland Award for Best Large Commercial Project.

Download the factsheet here

Explore more case studies

Kwinana Primary Data Centre

Kwinana Primary Data Centre

The Kwinana Primary Data Centre project saw Nilsen (WA) Pty Ltd deliver the electrical and communications infrastructure for Synergy at the Kwinana Power Station site in Naval Base, WA. The new facility was set up to monitor and control operations across four major...

read more
RubberGem HV Upgrade

RubberGem HV Upgrade

The development of RubberGem’s new facility at 6 Lodge Drive, East Rockingham required the delivery of a complete HV electrical distribution network to provide the permanent electrical infrastructure required for the new building and its industrial operations. Nilsen...

read more
Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital is a major tertiary hospital within Western Australia’s public health system, operating continuously and relying on highly resilient electrical infrastructure to support critical clinical and operational services. The Stage 1 High Voltage Upgrade...

read more

Get in touch

We’re here to deliver electrical technology solutions.

From large-scale infrastructure to tailored electrical solutions, reach out to our team today to find out how we can support your project.