Perth Film Studios

Client: Built Construction
October 5, 2026

Perth Film Studios

Client: Built Construction
October 5, 2026
Nilsen (WA) Pty Ltd delivered the full electrical and technology infrastructure for Perth Film Studios in Whiteman, WA, from August 2023 to February 2025.

As the first purpose-built film and television production facility in Western Australia, the project included advanced sound stages, production workshops, office areas, and a dedicated cinema, all designed to help position the state as a key player in both local and international production.

Nilsen was awarded the contract thanks to a strong, long-term partnership with the builder. Spanning an expansive 15.6-hectare site area, we managed a broad scope of works, delivering major electrical infrastructure, including Schneider Prismaset 4000A switchboards, the first deployment of this kind by Schneider in Australia, as well as dual-fibre networks, complex cable tray runs, integrated AV systems, and high-level Senstar security systems with CCTV, access control, and alarms.

The team worked through significant on-site challenges, executing extensive in-ground civil works across the site and operating in tight work areas within sound stage zones through clear area segregation, controlled site access, and strong coordination with other trades. Sound stages were engineered to support up to 2000A three-phase production loads, with provisions to scale up to 4000A utilising power enhancement techniques and subsidiary power generation.

Technical highlights also included specialist Dolby Atmos speaker wiring in the cinema, public address systems, and precise lighting installations both inside and out. The project was managed under our ISO 9001 certified Quality Management System, with a strong on-site HSE focus to ensure safety and manage risk. Environmental responsibility was built in from the start, meeting Green Star standards with reduced PVC cabling, low-VOC materials, a high-efficiency solar PV system, and the deployment of a 140kW temporary solar farm to power construction activities, achieving substantial carbon savings and a reduced environmental footprint.

Completing Perth Film Studios shows Nilsen’s capability to deliver complex, high-profile commercial infrastructure in WA, drawing on technical expertise and a commitment to quality, safety, and sustainability.

Download the factsheet here

Explore more case studies

Kwinana Primary Data Centre

Kwinana Primary Data Centre

The Kwinana Primary Data Centre project saw Nilsen (WA) Pty Ltd deliver the electrical and communications infrastructure for Synergy at the Kwinana Power Station site in Naval Base, WA. The new facility was set up to monitor and control operations across four major...

read more
RubberGem HV Upgrade

RubberGem HV Upgrade

The development of RubberGem’s new facility at 6 Lodge Drive, East Rockingham required the delivery of a complete HV electrical distribution network to provide the permanent electrical infrastructure required for the new building and its industrial operations. Nilsen...

read more
Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital is a major tertiary hospital within Western Australia’s public health system, operating continuously and relying on highly resilient electrical infrastructure to support critical clinical and operational services. The Stage 1 High Voltage Upgrade...

read more

Get in touch

We’re here to deliver electrical technology solutions.

From large-scale infrastructure to tailored electrical solutions, reach out to our team today to find out how we can support your project.