Austin Hospital HV and Generation Project

Client: Built
September 1, 2019

Austin Hospital HV and Generation Project

Client: Built
September 1, 2019
The Austin Hospital HV and Generation project is a testament to Nilsen’s outstanding skills as a tier one contractor. The scope of works was completed three months ahead of schedule in March 2018 which produced large cost and time savings and a much-improved profit.

Nilsen’s scope on the project included:

  • Upgrading of the existing LV emergency powerhouse generation system, all done while the hospitals (Austin and Mercy are co-located) remained fully operational
  • Decommissioning the HV generation system and installing a new LV generation system for Mental Health, Austin, Mercy, and Austin Central Plant switchboard
  • Installation of two new 1500 kVA dry type HV transformers in the Lance Townsend Building (LTB)
  • Installation of all new SEPAM relays in the HV system while hospital was still operational
  • Redesign to remove the Western substation and reallocate its workload. Due to ageing and faulty equipment we redesigned and relocated all outgoing submains to existing and new switchboards

Working in a live environment, Nilsen solved a diverse array of technical challenges: a long and complex cable pull completed with several innovations; a dangerous problem in the blocking scheme of the SEPAM relays; paralleling of generators; and bus-tying of switchboards to create an MEN link that made the neutral not live. No injuries were recorded on the project.

The project held great responsibility, where all of Nilsen’s work was geared towards ensuring that the complex never lost electrical power. This project has demonstrated the outstanding technical skills, collaborative skills, planning expertise and innovation that Nilsen brings to every project it works on.

 

Notably, Nilsen were awarded 2018 National Electrical and Communication Association (NECA) Victoria Best Large Commercial project for the Austin Hospital HV and Generation project.

Download the factsheet here

Explore more case studies

Kwinana Primary Data Centre

Kwinana Primary Data Centre

The Kwinana Primary Data Centre project saw Nilsen (WA) Pty Ltd deliver the electrical and communications infrastructure for Synergy at the Kwinana Power Station site in Naval Base, WA. The new facility was set up to monitor and control operations across four major...

read more
RubberGem HV Upgrade

RubberGem HV Upgrade

The development of RubberGem’s new facility at 6 Lodge Drive, East Rockingham required the delivery of a complete HV electrical distribution network to provide the permanent electrical infrastructure required for the new building and its industrial operations. Nilsen...

read more
Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital — HV Upgrade Stage 1

Royal Perth Hospital is a major tertiary hospital within Western Australia’s public health system, operating continuously and relying on highly resilient electrical infrastructure to support critical clinical and operational services. The Stage 1 High Voltage Upgrade...

read more

Get in touch

We’re here to deliver electrical technology solutions.

From large-scale infrastructure to tailored electrical solutions, reach out to our team today to find out how we can support your project.